RE: Township of Essa Engineering Services
On behalf of the Township of Essa (Township), I would like to acknowledge Greenland for its exemplary services to complete the 2022 Community of Angus Infrastructure Master Plan (IMP) Class Environmental Assessment (EA). This legacy Township document developed municipal water and wastewater system models. These calibrated tools were then used by Greenland to develop a sustainable infrastructure planning framework for water and wastewater servicing expansion requirements within the Community of Angus. The project was completed “on-budget and on-time” and cognizant of environmental, technical and socio-economic constraints and opportunities affecting the Township of Essa.
We also appreciate your team’s expertise to provide subsequent model-keeper and development peer review support services. These important responsibilities and overseen by Township staff will help ensure new development approvals proceed in a manner which is consistent with the infrastructure management and expansion needs established by the completed IMP EA project.
Finally, we recognize the professional credentials and attention to detail involvement by your assigned team led by Mr. Josh Maitland, P. Eng.
We look forward to working with Greenland on other projects and serving as a professional reference.
Michael Mikael, P.Eng
Manager of Public Works/Deputy CAO
Township of Essa
October 18, 2023
Re: Erosion Control and Advanced Sedimentation Pilot Project
On behalf of the Town of Innisfil, I would like to extend my sincere thanks to Greenland International Consulting Ltd. for their excellent work in completing the Erosion Control and Advanced Sedimentation Pilot Project for the Town of Innisfil, funded in part by the Federation of Canadian Municipalities. This project is a first step in broad-scale implementation of innovative stormwater management technologies in the Lake Simcoe Watershed to address on-going phosphorus and sediment concerns within the Lake.
Over the course of the three-year pilot project, Greenland studied the effectiveness of the Clearflow Group’s Advanced Sedimentation Technologies at an active development site in Innisfil. The project analyzed the performance of Clearflow’s Gel Flocculant Blocks and Treated Geo-Jute at removing fine sediments and nutrients at three stormwater management facilities that discharge to Lake Simcoe. These particles, and the associated nutrients and heavy metals, are traditionally not being removed by conventional stormwater management facilities and cause negative impacts downstream. The results of the project will help Innisfil and other municipalities and agencies to reduce sediment load from entering the environment as a result of construction activities.
As the lead consultant, Greenland coordinated with the Town staff, contractors, sub-consultants and the developer to ensure that open lines of communication were maintained and questions and issues raised were responded to promptly. The Greenland Team’s level of professionalism and thoroughness over the course of the project was valued by the Town.
Glen Switzer
Development Engineer
Town of Innisfil
July 8, 2022
RE: Town of Collingwood - Master Stormwater Management Final Report
Your team did a great job conveying the output of your work to the Development Committee last night. I think the analysis was well understood by Members, and that there is confidence in the approach you have taken to the work. This topic is very important for Collingwood, and it is great to have this intelligent analysis from which to continue to leap forward.
Sincerely,
Sonya G. Skinner, P. Eng.
Chief Administrative Officer
Corporation of the Town of Collingwood (Canada)
February 15, 2022
On behalf of Council and the residents of Collingwood, I want to thank you for generously giving your time, expertise and experience to our community to assist Town staff in addressing the water capacity issues at the Raymond A. Barker Water Treatment Plant (WTP).
Since becoming aware of the capacity issues this spring and then implementing an Interim Control By-Law, this issue has been the top priority of Council. Your input and contribution on proactive measures to mitigate the summer/winter capacity differential and to increase the WTP capacity pending the completion of the expansion have been of great benefit to Council and to staff. As a result of your input, Council directed staff to include the option of UV Disinfection retrofit to the existing WTP as part of the expansion design RFP process and we are optimistic this will be done.
Thank you for your personal and professional commitment to our community, it is impactful and very much appreciated by myself and my Council colleagues.
Yours very truly,
Bruan Saunderson
Mayor
Corporation of the Town of Collingwood (Canada)
July 7, 2021
Re: Capreol Downtown Waterfront CIP and Whitson River Waterway Trail
The City of Greater Sudbury has used the services of Greenland International Consulting Ltd. for the design of the Capreol Downtown Waterfront and the design of the Whitson River Waterway Trail.
Greenland delivered both projects on budget and provided consistency in its leadership from the landscape team. This stability in project management meant that we were working with a company who was familiar with the City’s project and consultation processes.
The Capreol Downtown Waterfront improvements were constructed in 2018 in time for the community’s 100th anniversary and incorporated the community’s railway history into the design. Greenland was skilled at integrating the wishes of the community into cohesive and creative designs that provide great connections between the Community’s main street areas and natural features.
Melissa Riou, MCIP, RPP
Senior Planner
Community and Strategic Planning
Growth and Infrastructure Department
City of Greater Sudbury
December 23, 2020
Re: Reference Letter
The municipality of Meaford has worked very closely with Greenland International Consulting Ltd. on a number of projects over the past few years. Some of these projects include the development of a master plan for property along the Bighead River in Meaford as well as the development of accessibility ramp in the urban core. Their visioning and attention to detail is some of the best I have ever worked with. Their willingness to communicate with staff and implement comments through public cosultation sessions makes the entire process flawless. I would highly recommend the services of Greenland International Consulting for any future planning projects.
Rod Willis
Manager, Parks and Facilities Services
Municipality of Meaford
November 13, 2020
RE: Town of Innisfil (Community of Alcona) Flood Reduction Class Environmental Assessment
On behalf of the Lake Simcoe Region Conservation Authority (LSRCA), I would like to thank GREENLAND® International - Consulting Engineers for the excellent work undertaken to complete the Flood Reduction Class Environmental Assessment for the Community of Alcona. I also want to provide you our sincere appreciation for the support GREENLAND® provided both in-kind and financially which allowed the project to proceed. The approved strategy will now enable the LSRCA and Town of Innisfil to move forward with the next phase of the project so that the science-based, publicly supported solution, can be implemented to alleviate flooding impacting residents in Alcona as soon as possible.
The project goal was to develop a sustainable - engineering solution to reduce significant annual flood damages currently occurring within the Community of Alcona (Town of Innisfil) and located within the Belle Aire Creek subwatershed. The project included a Class Environmental Assessment (EA) process with extensive public and other stakeholder consultations to advance a solution involving enhancing a wetland (green infrastructure) to provide flood mitigation. The project was proposed over a decade ago and was then adopted in the Town’s Master Drainage Plan as required under the Lake Simcoe Protection Plan. It is now one step closer to completion.
The project deliverables produced by GREENLAND® included an Environmental Study Report (ESR) which now provides a science-based, well-engineered, thorough and systematic understanding of the chronic flooding that has impacted the affected settlement area in the Town of Innisfil. The Environmental Study Report (by GREENLAND®) also developed a proactive flood mitigation and resiliency plan that can now be implemented by the LSRCA, Town and other stakeholders. Finally, the project work plan satisfied requirements of Ontario's Class Environmental Assessment process and with an effective/collaborative spirit of a "public-private partnership” utilizing and ecosystem approach. The timelines to complete the project were very aggressive and I was pleased that GREENLAND® was able to complete the project on-time and budget.
In conclusion, the role that GREENLAND® played to prepare the funding application for Canada’s National Disaster Mitigation Program; securing in-kind participation of the Intact Centre on Climate Adaptation (ICCA) at the University of Waterloo; providing in-kind Intellectual Property leveraging resources, and the financial contribution helped ensure the project was a complete success. I look forward to working with your company again on other partnerships of mutual interest and would be pleased to serve as professional references on similar projects.
Michael Walters
(Former) Chief Administrative Officer
Lake Simcoe Region Conservation Authority
November 6, 2020
RE: Town of Collingwood ‘Smart’ Stormwater Project
I would like to thank and recognize GREENLAND® for their leadership role in the above project. Your firm identified the opportunity to work together with other private firms and public sector organizations, together with the support of the Town of Collingwood and the Federation of Canadian Municipalities, to address a growing Concern in communities related to lot-level flood mitigation.
GREENLAND® strategized and implemented, over almost 3 years, the “first-ever in Canada” work plan to mitigate problems of climate-change induced stormwater flooding which impacts many residential, commercial and institutional properties. The innovative project approach monitored 4 different Low Impact Development (LID) approaches for reducing lot-level flooding and their ability to redirect site drainage away from municipal sewer systems. Using innovative real-time (aka ‘Smart’) technologies, GREENLAND® was also able to generate ‘Big Data’ that provided new insights into the effectiveness of these different approaches. The GREENLAND® team’s level of commitment, thoroughness and professionalism was appreciated by the municipality. GREENLAND® maintained open lines of communication with Town staff, contractors, participating residents, and promptly responded to all questions and issues raised by the public.
We commend your firm’s efforts as a pioneer in implementing this project approach.
Sonya Skinner
Acting Chief Administrative Officer
Town of Collingwood
June 2, 2020
On behalf of the Public Works Office of the Six Nations of the Grand River, we would like to thank Greenland International Consulting Limited for the work completed to prepare the Master Drainage and Flood Remediation Plan (MDFRP) for both the Boston Creek and Rogers Creek subwatersheds, as well as the McKenzie Creek Subwatershed. These findings have enabled our office to identify all flood prone residences, building structures and other infrastructure throughout these subwatersheds with the flood plain mapping that has been prepared as part of this assignment.
Greenland has been integral to assisting our Office with identifying and prioritizing the remedial projects to mitigate flooding in the McKenzie, Boston and Rogers Creek subwatersheds that flow through our Community. We also appreciate Greenland's effort in assisting the Six Nations of the Grand River with the preparation of funding applications to secure the resources to complete these remedial works. We are convinced that this MDFRP completed for McKenzie Creek, Boston Creek and Rogers Creek can be used as a template for completing similar drainage and flood remediation works both locally and in other First Nations.
Michael R. Montour
Director of Public Works
Six Nations of the Grand River
December 2, 2019
I would like to offer my congratulations as you celebrate the occasion of your 25th Anniversary.
Your grasp of environmental and development regulations in the Canadian market, and ability to work collaboratively with private and public partnerships in the delivery of award-winning engineering and technologies supporting municipal infrastructures, water resources, asset sustainability and more is most valued.
I wish you many years of prosperity and success in Simcoe-Grey.
Terry Dowdall
Member of Parliament for Simcoe-Grey
November 1, 2019
As the Member of Provincial Parliament for the riding of Barrie-Innisfil, I am pleased to extend my congratulations to The Greenland Group of Companies on the occasion of their 25th Anniversary.
Thank you for growing your business with a focus on making a minimal impact on the environment. The experience that you have gained already will prove invaluable to smarter, innovative developments.
I wish you continued success in delivering award-winning engineering and technologies as you serve communities across Canada.
Sincerely,
Andrea Khanjin
Barrie-Innisfil MPP
As a Senior Project Engineer (Water Resources) for the City of Waterloo, I would like to extend my appreciation to Greenland Consulting Engineers for providing exemplary EA planning, design, contract administration and construction inspection services for the Pond #53 Sediment Removal/Reuse and Retrofit Project.
This project was an important undertaking for the City which consisted of: the removal of 360m3 of sediment for reuse in a City owned boulevard area; removal of all additional sediment (approx. 3,000m3) from the SWMF permanent pool and forebay area to improve its operation, implementation of the retrofit design including improved maintenance access and proactive management of many unforeseen conditions throughout the duration of the project. This project also included significant logistical challenges with respect to the coordination of public access for area residents and businesses, and providing workable solutions to implementing the design as intended due to challenging unforseen site constraints.
As the Design Consultant, Contract Administrator and on-site Construction Inspector, Greenland always maintained open lines of communication between the City, Contractor and the affected residents, and promptly responded to all questions and issues raised by the Contractor, the City and the public. Greenland’s attention to detail throughout the entire duration of this assignment helped ensure the project was completed as required.
Jessica Kellerman, P. Eng
Senior Project Engineer - Water Resources
Engineering Services, Design & Construction
City of Waterloo
October 24, 2019
As Director of Public Works for the Town of Penetanguishene, I would like to extend my appreciation to Greeland Consulting Engineers for providing exemplary contract administration and construction inspection services for the Penetang Main Street Reconstruction Project.
The Main Street reconstruction was a huge undertaking for the Town which consisted of: the full reconstruction of 1.4 km of roadway including widening for improved land widths, on-street parking, storm sewer replacement, watermain and sanitary sewer replacement, as well as landscaping and lighting improvements to better serve businesses and residents. The project included significant logistical challenges with respect to the coordination of public access for businesses, and providing workable upgrades to exisiting infrastructure under difficult site constraints and a tight time line.
As the Contract Administrator and on-site Construction inspector, Greenland always maintained open lines of communication between the Town, Contractor, affected businesses and residents, and promptly, responded to all questions and issues raised by the Contractor, the Town and the public. Greeland's attention to detail throughout the assignment helped ensure the project was completed on-time and under budget.
Bryan Murray, P. Eng
Director of Public Works
Town of Penetanguishene
February 12, 2019
The Intact Centre on Climate Adaptation (ICCA) is a national applied research centre that focuses on mobilizing practical and cost-effective solutions to address climate change and extreme weather events. To this end, the ICCA is an incubator of new adaptation ideas, conducting research, knowledge mobilization and promoting initiatives aimed at de-risking the negative impacts of a changing climate and extreme weather. One of ICCA’s concerns is a growing uninsurable housing market in Canada relative to sewer backup.
ICCA believes the advanced technology and features of the SafeSump system can be instrumental to mitigating basement flood potential. I have one of the first prototypes of the SafeSump system installed in my home. I have interacted directly with the start-up founder. I view him as entrepreneurial and passionate, and have met other members of his team with whom I was similarly impressed. I am also familiar with Greenland Consulting Engineers, and congratulate SafeSump Inc. on their choice to create a joint “SafeSump” venture with Greenland.
ICCA looks forward to a supportive relationship with SafeSump Inc. upon the larger scale availability of their much-needed technology.
Dr. Blair Feltmate
Head, Intact Centre on Climate Adaptation
Faculty of Environment
University of Waterloo
October 6, 2016
On behalf of the Environment Office of the Six Nations of the Grand River, we would like to thank Greenland International Consulting Limited for the work completed to prepare the Master Drainage and Flood Remediation Plan (MDFRP) for the McKenzie Creek watershed. This plan has now enabled our office to identify the flood prone residences throughout the watershed with the flood plain mapping that has been prepared as part of this assignement. We appreciate the role that Greenland has played in assisting our office in directing Public Works with prioritizing the remedial projects to be completed in the flood prone areas.
We also appreciate Greenland's effort in assisting the Six Nations of the Grand River with the preparation of funding applications to secure the resources to complete these remedial works. We are convinced that this MDFRP can be used as a template for completing similar drainage and flood remediation works both locally and in other First Nations lands.
We look forward to working with your company again in the near future on the remaining watersheds that need this important work done.
Thank you for your ongoing assistance.
Clynt King
Environmental Technician
Six Nations Council Environment Office
July 25, 2016
On behalf of the City of Ottawa, we would like to thank Greenland International Consulting Limited, and in particular, Don Moss for his exemplary efforts in his role as Model Keeper for the City of Ottawa… Greenland has achieved a high level of confidence with Senior Staff and City Council as well Conservation authority and the Ontario Ministry of Environment… The City is appreciative of the new Modelling Tool developed by Greenland which will assist the City in conducting timely and efficient development reviews. The City will now be able to test proposed infrastructure with the overall development, determine changing impacts to existing infrastructure as ponds, as well as any changes to the receiving watercourses.
Don’s knowledge, dedication and professional approach over the past five years has been a crucial factor in the success of the project under very challenging circumstances.
Don Herweyer, MCIP, RPP
Program Manager
City of Ottawa
February 11, 2014
On behalf of the Simcoe County District School Board, I would like to thank the Greenland Group of Companies for their exemplary civil engineering and landscape architectural services. You have been an integral part of the Board’s success in a multitude of new construction projects. Greenland’s commitment, thoroughness, and professionalism have led to the success of each and every one of these projects. Your attention to timeliness and budgetary concerns makes you a leader in the field of consulting services.
Steve Parker
Manager – Design & Construction Services
Simcoe County District School Board
February 3, 2014
On behalf of the Town of The Blue Mountains, we would like to thank you and your organization for your specialized technical support in a peer review capacity over the past four years… Your team not only provided timely review of all drainage related features of development applications but introduced updated municipal design criteria addressing changing climatic conditions. By unraveling the weather factors that impact snow melt potential, your team has helped the Town better understand how to be proactive in developing sustainable infrastructure.
Your team’s support assisted in keeping Town’s development projects moving forward efficiently. In addition to this, the review and introduction of updated municipal design criteria and construction standards addressing changing climatic conditions, continues to ensure the Town of The Blue Mountains fulfills its mandate for sustainable development.
Reg Russwurm MBA, P. Eng.
Director of Engineering and Public Works
Town of The Blue Mountains
February 3, 2014
As Chief Administrative Officer for the Township of Adjala-Tosorontio, I would like to commend Greenland on their successful completion of the Everett Secondary Plan Master Servicing Plan and Class Environmental Assessment.
The level of service and timely delivery of all reports, analyses and correspondence was greatly appreciated by Township staff. Greenland’s innovative solutions and prompt responses to issues raised by the Town Staff Approvals Agencies and the affected public throughout the EA Process were very important, and we look forward to working with your team on future projects.
To that end, our team at the Township of Adjala-Tosorontio would be pleased to provide references for your firm on similar projects in future
Eric Wargel
Chief Administrative Officer
The Corporation of the Township of Adjala-Tosorontio
April 16, 2013
Greenland provided exemplary consulting services to complete this landmark project. The firm’s attention to detail and proactive ideas was very important to assist the County in addressing the issues of concern about the study’s findings and also providing defendable, yet provocative, solutions based on best available science and proven technologies for the benefit of all local municipalities.
This letter confirms that the study objectives were met within the approved time frame. Greenland also provided a sizeable in-kind contribution to complete value-added deliverables and established new partnerships in terms of future watershed modeling and technology development initiatives involving the County of Simcoe.
Rick Newlove, P. Eng.
General Manager of Engineering, Planning and Environment
County of Simcoe
May 1, 2012
I would like to congratulate Greenland Consulting Engineers on winning the 2012 Consulting Engineers of Ontario Environment Award of Excellence. The award recognizes your work on the Nottawasaga Pines Secondary School construction project with the Simcoe Country District School Board. This is a well deserved honour and is a reflection of both the caliber of your work and your team.
I continue to be impressed with your company’s commitment and innovation in the field of sustainable development. You have set an excellent example for others throughout Simcoe County and the Province of Ontario.
John Skorobohacz
(Former) Chief Administrative Officer
The Corporation of the Town of Innisfil
May 1, 2012
On behalf of the Town of Collingwood, I would like to thank the Greenland Group of Companies for their design and execution of the Town’s vision for Heritage Park, coordination of all consultants, contract administration and construction inspection.
Greenland always strives for thoroughness, professionalism and addressing their clients needs on each of their projects – this was no exception.
Peter G. Dunbar
Director, Leisure Services
Town of Collingwood
August 30, 2010
On behalf of Moriyama & Teshima Architects, I would like to thank you for your high level of competence and involvement expressed in the design process on the Keele Street Public School Addition and Renovation project… I felt you were integral and instrumental in coming in and taking the project from an ill-fated design…to design completion, tender and the approvals stage. You showed high levels of knowledge and understanding in your field, and your thoroughness and professionalism have led to the success of this project to date. I am thoroughly satisfied in the way you designed the services system, dealt with authorities having jurisdiction, and for your recommendations regarding budgetary concerns.
I would not hesitate in recommending you as a civil engineering consultant on any further project I am involved with.
Gene Ascenzi B.Arch, OAA, MRAIC, LEEP AP
Project Manager
Moriyama & Teshima Architects
August 25, 2014
On behalf of the Saskatchewan Ministry of Environment (the ‘Ministry’), we would like to thank Stragis Environmental Services Inc. for its exemplary efforts as an environmental consultant…
The level of service and timely delivery of all reports, analyses and correspondence was greatly appreciated by the Ministry staff… Stragis has provided important insight and recommendations regarding the Ministry’s proactive approach to ensure compliance with all applicable regulations.
To that end, our team at the Ministry would be pleased to provide references for your firm on similar projects in the future.
Chris Milligan
Logistics & Assets Coordinator
Saskatchewan Ministry of Environment
January 17, 2014
We are pleased to write in full support of the Canada-Europe Partnership, particularly the collaboration of the Interdisciplinary Centre on Climate Change (IC3) and the
Partners for Action (P4A) network to support incorporation of climate change considerations in the project and assist in testing FLOODVIEW with Canadian municipalities and insurers.
P4A and IC3 are dedicated to consideration of climate change in Canada’s approach to flood risk management, and dissemination of knowledge and best practices to the insurance industry, government decision-makers, and the Canadian public. We look forward to partnering with you to identify effective solutions to minimize urban flooding.
Dr. Daniel Scott
Executive Director
Interdisciplinary Centre on Climate Change
Faculty of Environment University of Waterloo
October 20, 2015
The County of Simcoe is the upper tier government and planning authority for most of the South Georgian Bay – Lake Simcoe Source Water Protection Region. The County, in partnership with its member municipalities, other levels of government, floodplain management agencies and two (2) conservation authorities, also provides leadership through policy, and actively in the restoration and protection of the environmental health and quality of these watersheds. As you know, in order to comply with, and be environmentally proactive with respect to the Province of Ontario’s “Places to Grow” legislation, the County of Simcoe utilized innovative decision support tools such as Greenland’s CANWET™ model. In 2012, CANWET™ was also used by the County to prepare a “Water and Wastewater Infrastructure Visioning Strategy”. To this day, the information in the Strategy’s final report is used by local municipalities, development interests and other stakeholders as a background reference to help identify sustainable development solutions.
This letter confirms the County of Simcoe's commitment of support which includes initially facilitating the introduction of this landmark international collaboration with all 16 local municipalities, other governments (small and large) and other agencies that partner now with the County of Simcoe on land use planning; infrastructure renewal; and flooding risk/damage reduction initiatives.
As always, I look forward to our continued working relationship with you and your colleagues and the significant benefits these efforts will have for our residents and environment. The County of Simcoe appreciates your efforts towards developing information based decision making tools and we are confident that this project will prove beneficial in our collaborative goal to improve watershed health for all County residents.
Mark Aitken
Chief Administration Officer
The Corporation of the County of Simcoe
October 19, 2015
The reappearance of excessive nutrient loading in Lake Erie and the subsequent algae blooms is an extremely complex issue and is quite different in nature than the previous phosphorous loadings in the 1970s. Unlike the issue in the 1970s, there are far more sources adding nutrients to the late and these sources are diverse in nature ranging from rural to urban. In order to understand the nutrient loading, both in the temporal and spatial domains, more complex analytic and predictive tools are required in order to help policy make sound, science based, and defendable solutions.
The University of Guelph is uniquely positioned to help address the issues around Lake Erie with long standing core strengths in both the agricultural sector and the environmental field. In conjunction with our partner, Greenland Consulting Engineers, and their watershed evaluation tool (CANWETTM), we believe that we have the engineering and technology to extrapolate CANWETTM from the watershed level up to the lake basin level and provide decision-making support for the entire Lake Erie basin.
Hussein Abdullah, Ph.D., P. Eng.
Director, School of Engineering
University of Guelph
January, 26 2015
I would like to recognize the active involvement of the GREENLAND Ground of Companies in the Town of Collingwood's economic development efforts and dedication to helping advance the Town's vision of being a specialized technology hub. Their extensive knowledge of the water technology and land development industries, coupled with their desire to help propel Collingwood forward as a regional economic leader, are very much appreciated.
The Town is proud to have GREENLAND in the community as they have also been key supporters in facilitating introductions with renowned organizations, such as the University of Guelph, University of Waterloo, WaterTAP, Communitech, Canadian Water Resources Association and Canadian Water Network. These organizations and others will help Collingwood secure new businesses with a recreational and healthy lifestyle focus. GREENLAND is also a passionate supporter of youth networking and knowledge transfer initiatives, providing financial assistance for Collingwood Youth Centre initiatives at www.collingwoodyouthcentre.ca
Fareed Amin
Chief Administrative Officer
The Corporation of the Town of Collingwood
April 9, 2018
The Greenland Group (Greenland) was introduced to Communitech in 2013. This letter is to acknowledge the importance of this proactive joint venture and to indicate our strong interest in future project partnerships with Greenland and other network members.
Greenland is now supporting other joint initiatives with Communitech. These leading-edge information technology partners will include other private sector members with the Communitech network, as well as Ontario government agencies and First Nation communities. These projects are intended to develop commercialized products and services involving the Greenland Group and other Communitech partners and to enable new Canada-wide related collaborations.
Mark, if any your prospective clients or contacts have questions regarding our collaborative efforts to date, ongoing discussions and project leveraging capabilities, the Communitech team would be more than happy to help.
We look forward to our continued strong collaboration with Greenland.
Iain Klugman
CEO
Communitech
February 19, 2015
The Walton Group of Companies is a multinational real estate investment and development firm concentrating on the research, acquisition, administration, planning and development of strategically located land in major North American growth corridors. With nearly 90,000 acres of land under administration including 22 development projects, Walton is one of North America’s premier land asset managers.
Walton Development and Management L.P. (“Walton”) has retained Greenland International Consulting Ltd. (“Greenland”) to assist with our municipal infrastructure planning and engineering design for several new communities in the County of Simcoe, Ontario including environmental assessments and water resource analysis. Greenland is highly regarded in the industry for their professional approach to the environmental aspects of these projects and state-of-the-art decision support tools (such as CANWETTM) to address climate change adaptation, cumulative watershed impact, and adaptive management such as post-construction performance monitoring. Greenland’s business model is unique and has provided Walton with value-added deliverables through the use of best available science and solution-based methodology. This includes forming a landmark public/private sector phosphorous reduction program to protect a sensitive fishery habitat system within headwaters of the Nottawasaga River Basin for one of Walton’s projects in Simcoe County. Greenland’s CANWETTM model and other in-house stormwater management and climate change impact assessment tools were instrumental for Walton to establish long-term partnerships in this community, including the local municipality, Nottawasaga Valley Conservation Authority and other key stakeholders.
Paolo Sacilotto
General Manager, Simcoe
Walton Development and Management L.P
February 13, 2015
The Muskoka Watershed Council’s mission is to champion watershed health in those watersheds that flow into and through the District Municipality of Muskoka. There is no conservation authority in Muskoka, instead the Council is a volunteer-based organization supported by the District of Muskoka, local consulting firms, and local Ministry of Natural Resources and Forestry and Ministry of the Environment and Climate Change offices.
The Muskoka Watershed Council is currently undertaking a project to understand the potential impact of climate change in Muskoka to the year 2050. In working with our municipal partners, decision support tools such as Greenland’s new CANWET-5 model could be useful in informing our watershed management planning decisions in relation to policy development, stewardship priorities and education and communication programs.
Peter Sale
Chair
Muskoka Watershed Council
November 17, 2014
The Authority’s mission is to provide leadership in the restoration and protection of the environmental health and quality of Lake Simcoe and its watershed with our community, municipal and other government partners. As a resource management agency, we rely on decision support tools such as Greenland’s CANWET model. It continues to play a key role in informing our watershed management planning decisions in relation to policy development, stewardship priorities and education and communication programs.
As always, I look forward to our continued working relationship with you and your colleagues. The Authority appreciates your hard work, and we are confident that this study will prove beneficial in our collaborative goal to improve the health of the Lake Simcoe watershed.
Michael Walters
Chief Administrative Officer
Lake Simcoe Region Conservation Authority
November 4, 2014
In March of 2013, Greenland International Consulting Ltd. completed a study for Agriculture and Agri-Food Canada to estimate nutrient loading in small catchment of about 177 square kilometers in the La Salle River watershed in southern Manitoba using the CANWET 4 model. Given uncertainties in some input data and model parameters, the preliminary results using the CANWET 4 model for baseline conditions of stream discharge, nutrient concentrations and loads were satisfactory in our project team as simulated values were within the range of observed values during the validation period.
This study suggests the CANWET 4 modeling approach could be used to predict changes to nutrient loads from changing land use scenarios in watersheds of this region.
Jason Vanrobaeys
Senior Land Resource Specialist
Agriculture and Agri-Food Canada
On behalf of the Mississippi Valley Conservation Authority, we would like to thank you and your consulting firm for your technical capacity in completing the CANWET model with baseline conditions in our watershed.
I have worked closely with Greenland Consulting Engineers (Greenland) over the past two years as part of this project. We also value your staff’s ability to troubleshoot issues and respond on time. Greenland’s commitment, thoroughness, and professionalism have led to the success of this project with the addition of a new routine to the CANWET software.
It has been a great pleasure to work with Greenland and we look forward to using your expertise again in the near future.
Sobhalatha Kunjikutty, Ph.D, P.Eng.
Water Resources Engineer
Mississippi Valley Conservation Authority
February 19, 2015
I wanted to take this opportunity to thank you for your work on the Brampton “Pond 10 Floating Islands Research Project”. This project was a “first of its kind” within our watershed.
Greenland was responsible for preparing the design brief for the islands that provided details on the anchoring system design, safety considerations and a strategy for establishing a vegetation community among other things. This was a challenging project given that there was no pre-established process to follow and therefore we were defining the design and implementation process from scratch.
Greenland was always very responsive when issues arose and helped us troubleshoot options to solve the issue. They refined the design brief and assisted CVC with implementing improved anchor designs that have been successful in keeping the islands stable over the past few years even though some extreme weather events.
We were very pleased with the consulting services Greenland provided for this project.
Phil James, P.Eng.
Manager, Watershed Protection and Restoration
Credit Valley Conservation
March 14, 2014
Sustainable Buildings Canada (SBC) has worked closely with Greenland Consulting Engineers (Greenland) as part of the Savings By Design program offered by Enbridge Gas Distribution. The program features an integrated design workshop that exposes builders and developers to the potential environmental and energy performance benefits that can be achieved through a holistic planning process. This includes identifying alternative approaches to site sustainability including low impact development and storm water management.
Inherent in the integrated design process is the need to access experienced and highly qualified individuals and organizations that can identify potential alternative solutions. SBC has a very capable roster of consultants that represent the core expertise required for this kind of expertise. Greenland is one of those organizations, providing critical input related to storm water management, low impact development and site sustainability.
Greenland consulting staff are all extremely knowledgeable and up to date on the various issues related to storm water management and low impact development and have always provided that expertise in a professional manner, recognizing the need to be sensitive to both the needs of the developers and the desire to improve environmental performance. It has been a great pleasure to work with Greenland and we look forward to doing so in the future.
Michael Singleton
Executive Director
Sustainable Buildings Canada
November 1, 2013
I am writing to acknowledge the completion of a successful R&D project funded by the National Research Council’s Industrial Research Assistance Program (NRC-IRAP).
Your firm’s performance on the project was excellent, and your team was a pleasure to work with.
The CANWET product that you have commercialized since the end of the project represents a strong step forward in your field, and you should be proud.
We wish you well in the successful commercialization of the technology, and the continued growth of your firm which will contribute to the Canadian economy.
Doug Reed
Industrial Technology Advisor
NRC-IRAP
July 8, 2011
Mayor David Miller and Members of Toronto City Council extend appreciation to Greenland Group of Companies for your outstanding contribution to the City of Toronto’s Green Roof Technical Advisory Group. As a participant of the City of Toronto’s Green Roof Technical Advisory Board, you have contributed tremendously to its leadership role on climate change and helped support the development of the Toronto Green Roof By-law.
This initiative, the first of its kind in North America, sets the standard in designing sites and buildings across the city that are more environmentally friendly, a key strategy in reducing the effects of climate change.
We thank you for helping our city achieve its vision and goals on climate change – it is this kind of collaboration that makes us proud, prosperous and successful.
Best wishes for continued success.
David Miller
Mayor
City of Toronto
May 2010
Check out this (Greenland) video of THREATS (an open-source cumulative effects assessment tool to help direct environmental management (industrial or other)) and/or planning of future projects. It enables the compiling and juxtaposition of public environmental data (including, but not limited to, wildlife use areas and environmental quality data) with on-site or "targeted" environmental data. For security, the provision to include data protected behind a firewall exists to enable analysis and comparison of potentially sensitive data in the context of other datasets. The goal here is to allow for predictive capability and in turn mitigate potential effects. Equally, this provides a capacity to enable retroactive assessment (investigation of cause) of observed changes. The ability to spatially interpret stressor/pathway/receptor data, and conduct analyses within the tool, while retaining data in its original database (secure) is what is truly unique here. Excited to see what can be achieved with this powerful platform in areas where it has already begun to be used!
Neal Tanna
Advisor, Monitoring and Risk Assessment
Canada’s Oil Sands Innovation Alliance (COSIA)
November 3, 2017
Landrex is currently working with Greenland and business partner, Clearflow Group, to develop strategies to improve the functionality of stormwater management facilities in Landrex's (ie the City's) existing and future communities in North St. Albert, namely within the Erin Ridge North neighbourhood.
Landrex has been impressed with the collaborative and innovative approach that Clearflow and Greenland provide; they are a solutions-based group that are tremendously attentive, responsive and client focused. We believe they would be an extremely valued partner to the City of Saint Albert and represent the qualified, licensed, and professional consulting firm that the City so seeks.
Jim Sheasgreen, P. Eng.
President
Landrex Inc.
May 15, 2018
Landrex
Landrex is currently working with Greenland and business partner, Clearflow Group, to develop strategies to improve the functionality of stormwater management facilities in Landrex's (ie the City's) existing and future communities in North St. Albert, namely within the Erin Ridge North neighbourhood.
Landrex has been impressed with the collaborative and innovative approach that Clearflow and Greenland provide; they are a solutions-based group that are tremendously attentive, responsive and client focused. We believe they would be an extremely valued partner to the City of Saint Albert and represent the qualified, licensed, and professional consulting firm that the City so seeks.
Jim Sheasgreen, P. Eng.
President
Landrex Inc.
May 15, 2018
City of Ottawa
On behalf of the City of Ottawa, we would like to thank Greenland International Consulting Limited, and in particular, Don Moss for his exemplary efforts in his role as Model Keeper for the City of Ottawa… Greenland has achieved a high level of confidence with Senior Staff and City Council as well Conservation authority and the Ontario Ministry of Environment… The City is appreciative of the new Modelling Tool developed by Greenland which will assist the City in conducting timely and efficient development reviews. The City will now be able to test proposed infrastructure with the overall development, determine changing impacts to existing infrastructure as ponds, as well as any changes to the receiving watercourses.
Don’s knowledge, dedication and professional approach over the past five years has been a crucial factor in the success of the project under very challenging circumstances.
Don Herweyer, MCIP, RPP
Program Manager
City of Ottawa
February 11, 2014
Mississippi Valley Conservation Authority
On behalf of the Mississippi Valley Conservation Authority, we would like to thank you and your consulting firm for your technical capacity in completing the CANWET model with baseline conditions in our watershed.
I have worked closely with Greenland Consulting Engineers (Greenland) over the past two years as part of this project. We also value your staff’s ability to troubleshoot issues and respond on time. Greenland’s commitment, thoroughness, and professionalism have led to the success of this project with the addition of a new routine to the CANWET software.
It has been a great pleasure to work with Greenland and we look forward to using your expertise again in the near future.
Sobhalatha Kunjikutty, Ph.D, P.Eng.
Water Resources Engineer
Mississippi Valley Conservation Authority
February 19, 2015