Active & Completed Projects:
Bolton Camp Architectural and Engineering Services
Public Storage Facility - Scarborough, ON
Region of Durham Material Recovery Facility
Portage Place - Peterborough, ON
Di Domizio Residential Development
The City of Waterloo
As a Senior Project Engineer (Water Resources) for the City of Waterloo, I would like to extend my appreciation to Greenland Consulting Engineers for providing exemplary EA planning, design, contract administration and construction inspection services for the Pond #53 Sediment Removal/Reuse and Retrofit Project.
This project was an important undertaking for the City which consisted of: the removal of 360m3 of sediment for reuse in a City owned boulevard area; removal of all additional sediment (approx. 3,000m3) from the SWMF permanent pool and forebay area to improve its operation, implementation of the retrofit design including improved maintenance access and proactive management of many unforeseen conditions throughout the duration of the project. This project also included significant logistical challenges with respect to the coordination of public access for area residents and businesses, and providing workable solutions to implementing the design as intended due to challenging unforseen site constraints.
As the Design Consultant, Contract Administrator and on-site Construction Inspector, Greenland always maintained open lines of communication between the City, Contractor and the affected residents, and promptly responded to all questions and issues raised by the Contractor, the City and the public. Greenland’s attention to detail throughout the entire duration of this assignment helped ensure the project was completed as required.
Jessica Kellerman, P. Eng
Senior Project Engineer - Water Resources
Engineering Services, Design & Construction
City of Waterloo
October 24, 2019
Intact Centre on Climate Adaptation
The Intact Centre on Climate Adaptation (ICCA) is a national applied research centre that focuses on mobilizing practical and cost-effective solutions to address climate change and extreme weather events. To this end, the ICCA is an incubator of new adaptation ideas, conducting research, knowledge mobilization and promoting initiatives aimed at de-risking the negative impacts of a changing climate and extreme weather. One of ICCA’s concerns is a growing uninsurable housing market in Canada relative to sewer backup.
ICCA believes the advanced technology and features of the SafeSump system can be instrumental to mitigating basement flood potential. I have one of the first prototypes of the SafeSump system installed in my home. I have interacted directly with the start-up founder. I view him as entrepreneurial and passionate, and have met other members of his team with whom I was similarly impressed. I am also familiar with Greenland Consulting Engineers, and congratulate SafeSump Inc. on their choice to create a joint “SafeSump” venture with Greenland.
ICCA looks forward to a supportive relationship with SafeSump Inc. upon the larger scale availability of their much-needed technology.
Dr. Blair Feltmate
Head, Intact Centre on Climate Adaptation
Faculty of Environment
University of Waterloo
October 6, 2016
County of Simcoe
The County of Simcoe is the upper tier government and planning authority for most of the South Georgian Bay – Lake Simcoe Source Water Protection Region. The County, in partnership with its member municipalities, other levels of government, floodplain management agencies and two (2) conservation authorities, also provides leadership through policy, and actively in the restoration and protection of the environmental health and quality of these watersheds. As you know, in order to comply with, and be environmentally proactive with respect to the Province of Ontario’s “Places to Grow” legislation, the County of Simcoe utilized innovative decision support tools such as Greenland’s CANWET™ model. In 2012, CANWET™ was also used by the County to prepare a “Water and Wastewater Infrastructure Visioning Strategy”. To this day, the information in the Strategy’s final report is used by local municipalities, development interests and other stakeholders as a background reference to help identify sustainable development solutions.
This letter confirms the County of Simcoe's commitment of support which includes initially facilitating the introduction of this landmark international collaboration with all 16 local municipalities, other governments (small and large) and other agencies that partner now with the County of Simcoe on land use planning; infrastructure renewal; and flooding risk/damage reduction initiatives.
As always, I look forward to our continued working relationship with you and your colleagues and the significant benefits these efforts will have for our residents and environment. The County of Simcoe appreciates your efforts towards developing information based decision making tools and we are confident that this project will prove beneficial in our collaborative goal to improve watershed health for all County residents.
Mark Aitken
Chief Administration Officer
The Corporation of the County of Simcoe
October 19, 2015