Active & Completed Projects:
Bolton Camp Architectural and Engineering Services
Public Storage Facility - Scarborough, ON
Region of Durham Material Recovery Facility
Portage Place - Peterborough, ON
Di Domizio Residential Development
Intact Centre on Climate Adaptation
The Intact Centre on Climate Adaptation (ICCA) is a national applied research centre that focuses on mobilizing practical and cost-effective solutions to address climate change and extreme weather events. To this end, the ICCA is an incubator of new adaptation ideas, conducting research, knowledge mobilization and promoting initiatives aimed at de-risking the negative impacts of a changing climate and extreme weather. One of ICCA’s concerns is a growing uninsurable housing market in Canada relative to sewer backup.
ICCA believes the advanced technology and features of the SafeSump system can be instrumental to mitigating basement flood potential. I have one of the first prototypes of the SafeSump system installed in my home. I have interacted directly with the start-up founder. I view him as entrepreneurial and passionate, and have met other members of his team with whom I was similarly impressed. I am also familiar with Greenland Consulting Engineers, and congratulate SafeSump Inc. on their choice to create a joint “SafeSump” venture with Greenland.
ICCA looks forward to a supportive relationship with SafeSump Inc. upon the larger scale availability of their much-needed technology.
Dr. Blair Feltmate
Head, Intact Centre on Climate Adaptation
Faculty of Environment
University of Waterloo
October 6, 2016
Urbantech® Consulting
Hi Mark,
Thanks for the note. Both files went very well, both approved at LPAT and we are in detail design now. The input from the Greenland team was greatly appreciated and ensured the hydraulic analysis was accurate. Conservation Halton signed off on the hazard mapping ahead of both LPAT hearings which was huge!
J. David Leighton, C.E.T.
President
Urbantech® Consulting (Markham, Canada)
November 29, 2024
Town of Innisfil
Re: Erosion Control and Advanced Sedimentation Pilot Project
On behalf of the Town of Innisfil, I would like to extend my sincere thanks to Greenland International Consulting Ltd. for their excellent work in completing the Erosion Control and Advanced Sedimentation Pilot Project for the Town of Innisfil, funded in part by the Federation of Canadian Municipalities. This project is a first step in broad-scale implementation of innovative stormwater management technologies in the Lake Simcoe Watershed to address on-going phosphorus and sediment concerns within the Lake.
Over the course of the three-year pilot project, Greenland studied the effectiveness of the Clearflow Group’s Advanced Sedimentation Technologies at an active development site in Innisfil. The project analyzed the performance of Clearflow’s Gel Flocculant Blocks and Treated Geo-Jute at removing fine sediments and nutrients at three stormwater management facilities that discharge to Lake Simcoe. These particles, and the associated nutrients and heavy metals, are traditionally not being removed by conventional stormwater management facilities and cause negative impacts downstream. The results of the project will help Innisfil and other municipalities and agencies to reduce sediment load from entering the environment as a result of construction activities.
As the lead consultant, Greenland coordinated with the Town staff, contractors, sub-consultants and the developer to ensure that open lines of communication were maintained and questions and issues raised were responded to promptly. The Greenland Team’s level of professionalism and thoroughness over the course of the project was valued by the Town.
Glen Switzer
Development Engineer
Town of Innisfil
July 8, 2022