The following are Project Profiles that have been completed by Urban Watershed Group.
Bolton Camp Architectural and Engineering Services
Public Storage Facility - Scarborough, ON
Region of Durham Material Recovery Facility
Portage Place - Peterborough, ON
Di Domizio Residental Development
Credit Valley Conservation
I wanted to take this opportunity to thank you for your work on the Brampton “Pond 10 Floating Islands Research Project”. This project was a “first of its kind” within our watershed.
Greenland was responsible for preparing the design brief for the islands that provided details on the anchoring system design, safety considerations and a strategy for establishing a vegetation community among other things. This was a challenging project given that there was no pre-established process to follow and therefore we were defining the design and implementation process from scratch.
Greenland was always very responsive when issues arose and helped us troubleshoot options to solve the issue. They refined the design brief and assisted CVC with implementing improved anchor designs that have been successful in keeping the islands stable over the past few years even though some extreme weather events.
We were very pleased with the consulting services Greenland provided for this project.
Phil James, P.Eng.
Manager, Watershed Protection and Restoration
Credit Valley Conservation
March 14, 2014
Corporation of the Town of Collingwood (Canada)
On behalf of Council and the residents of Collingwood, I want to thank you for generously giving your time, expertise and experience to our community to assist Town staff in addressing the water capacity issues at the Raymond A. Barker Water Treatment Plant (WTP).
Since becoming aware of the capacity issues this spring and then implementing an Interim Control By-Law, this issue has been the top priority of Council. Your input and contribution on proactive measures to mitigate the summer/winter capacity differential and to increase the WTP capacity pending the completion of the expansion have been of great benefit to Council and to staff. As a result of your input, Council directed staff to include the option of UV Disinfection retrofit to the existing WTP as part of the expansion design RFP process and we are optimistic this will be done.
Thank you for your personal and professional commitment to our community, it is impactful and very much appreciated by myself and my Council colleagues.
Yours very truly,
Bruan Saunderson
Mayor
Corporation of the Town of Collingwood (Canada)
July 7, 2021
Intact Centre on Climate Adaptation
The Intact Centre on Climate Adaptation (ICCA) is a national applied research centre that focuses on mobilizing practical and cost-effective solutions to address climate change and extreme weather events. To this end, the ICCA is an incubator of new adaptation ideas, conducting research, knowledge mobilization and promoting initiatives aimed at de-risking the negative impacts of a changing climate and extreme weather. One of ICCA’s concerns is a growing uninsurable housing market in Canada relative to sewer backup.
ICCA believes the advanced technology and features of the SafeSump system can be instrumental to mitigating basement flood potential. I have one of the first prototypes of the SafeSump system installed in my home. I have interacted directly with the start-up founder. I view him as entrepreneurial and passionate, and have met other members of his team with whom I was similarly impressed. I am also familiar with Greenland Consulting Engineers, and congratulate SafeSump Inc. on their choice to create a joint “SafeSump” venture with Greenland.
ICCA looks forward to a supportive relationship with SafeSump Inc. upon the larger scale availability of their much-needed technology.
Dr. Blair Feltmate
Head, Intact Centre on Climate Adaptation
Faculty of Environment
University of Waterloo
October 6, 2016