Bolton Camp Architectural and Engineering Services
Public Storage Facility - Scarborough, ON
Region of Durham Material Recovery Facility
Portage Place - Peterborough, ON
Di Domizio Residential Development
Lake Simcoe Region Conservation Authority
RE: Town of Innisfil (Community of Alcona) Flood Reduction Class Environmental Assessment
On behalf of the Lake Simcoe Region Conservation Authority (LSRCA), I would like to thank GREENLAND® International - Consulting Engineers for the excellent work undertaken to complete the Flood Reduction Class Environmental Assessment for the Community of Alcona. I also want to provide you our sincere appreciation for the support GREENLAND® provided both in-kind and financially which allowed the project to proceed. The approved strategy will now enable the LSRCA and Town of Innisfil to move forward with the next phase of the project so that the science-based, publicly supported solution, can be implemented to alleviate flooding impacting residents in Alcona as soon as possible.
The project goal was to develop a sustainable - engineering solution to reduce significant annual flood damages currently occurring within the Community of Alcona (Town of Innisfil) and located within the Belle Aire Creek subwatershed. The project included a Class Environmental Assessment (EA) process with extensive public and other stakeholder consultations to advance a solution involving enhancing a wetland (green infrastructure) to provide flood mitigation. The project was proposed over a decade ago and was then adopted in the Town’s Master Drainage Plan as required under the Lake Simcoe Protection Plan. It is now one step closer to completion.
The project deliverables produced by GREENLAND® included an Environmental Study Report (ESR) which now provides a science-based, well-engineered, thorough and systematic understanding of the chronic flooding that has impacted the affected settlement area in the Town of Innisfil. The Environmental Study Report (by GREENLAND®) also developed a proactive flood mitigation and resiliency plan that can now be implemented by the LSRCA, Town and other stakeholders. Finally, the project work plan satisfied requirements of Ontario's Class Environmental Assessment process and with an effective/collaborative spirit of a "public-private partnership” utilizing and ecosystem approach. The timelines to complete the project were very aggressive and I was pleased that GREENLAND® was able to complete the project on-time and budget.
In conclusion, the role that GREENLAND® played to prepare the funding application for Canada’s National Disaster Mitigation Program; securing in-kind participation of the Intact Centre on Climate Adaptation (ICCA) at the University of Waterloo; providing in-kind Intellectual Property leveraging resources, and the financial contribution helped ensure the project was a complete success. I look forward to working with your company again on other partnerships of mutual interest and would be pleased to serve as professional references on similar projects.
Michael Walters
(Former) Chief Administrative Officer
Lake Simcoe Region Conservation Authority
November 6, 2020
Blue Mountain Watershed Trust Foundation
RE: Huntingwood Trail East OLT – Expert Witness Support
On behalf of the Blue Mountain Watershed Trust Foundation (aka ‘Trust’), I would like to extend the Board of Directors’ sincere gratitude to GREENLAND® for its exemplary technical support on the recent Ontario Land Tribunal (OLT) case.
GREENLAND® was retained to develop a defendable, 2-dimensional hydraulic model of the Silver Creek system with many accompanying spills, and in the vicinity of the proposed development. Your firm’s expertise and proficiency with 2-D hydraulic modelling - floodplain management projects were also instrumental in achieving an amicable solution with the developer’s engineering team lead. The solution will now protect residents and property from increased flooding impacts associated with the original subdivision plan (and for only this development phase).
This included your impeccable team to always maintain prompt communication between the OLT parties, and providing staff expertise and support for a concurrent public engagement by the Trust. Your team’s attention to detail and cross-functional collaboration approach was also key to identifying an amicable solution by all parties of the OLT, and as part of an OLT Settlement.
Mark, it was a pleasure to work with GREENLAND® on this file. Thank you also to your team.
Carl Michener
President
Blue Mountain Watershed Trust Foundation
March 29, 2026
Town of Penetanguishene
As Director of Public Works for the Town of Penetanguishene, I would like to extend my appreciation to Greeland Consulting Engineers for providing exemplary contract administration and construction inspection services for the Penetang Main Street Reconstruction Project.
The Main Street reconstruction was a huge undertaking for the Town which consisted of: the full reconstruction of 1.4 km of roadway including widening for improved land widths, on-street parking, storm sewer replacement, watermain and sanitary sewer replacement, as well as landscaping and lighting improvements to better serve businesses and residents. The project included significant logistical challenges with respect to the coordination of public access for businesses, and providing workable upgrades to exisiting infrastructure under difficult site constraints and a tight time line.
As the Contract Administrator and on-site Construction inspector, Greenland always maintained open lines of communication between the Town, Contractor, affected businesses and residents, and promptly, responded to all questions and issues raised by the Contractor, the Town and the public. Greenland's attention to detail throughout the assignment helped ensure the project was completed on-time and under budget.
Bryan Murray, P. Eng
Director of Public Works
Town of Penetanguishene
February 12, 2019