Active & Completed Projects:
Bolton Camp Architectural and Engineering Services
Public Storage Facility - Scarborough, ON
Region of Durham Material Recovery Facility
Portage Place - Peterborough, ON
Di Domizio Residential Development
Corporation of the Town of Collingwood (Canada)
RE: Town of Collingwood - Master Stormwater Management Final Report
Your team did a great job conveying the output of your work to the Development Committee last night. I think the analysis was well understood by Members, and that there is confidence in the approach you have taken to the work. This topic is very important for Collingwood, and it is great to have this intelligent analysis from which to continue to leap forward.
Sincerely,
Sonya G. Skinner, P. Eng.
Chief Administrative Officer
Corporation of the Town of Collingwood (Canada)
February 15, 2022
University of Guelph
The reappearance of excessive nutrient loading in Lake Erie and the subsequent algae blooms is an extremely complex issue and is quite different in nature than the previous phosphorous loadings in the 1970s. Unlike the issue in the 1970s, there are far more sources adding nutrients to the late and these sources are diverse in nature ranging from rural to urban. In order to understand the nutrient loading, both in the temporal and spatial domains, more complex analytic and predictive tools are required in order to help policy make sound, science based, and defendable solutions.
The University of Guelph is uniquely positioned to help address the issues around Lake Erie with long standing core strengths in both the agricultural sector and the environmental field. In conjunction with our partner, Greenland Consulting Engineers, and their watershed evaluation tool (CANWETTM), we believe that we have the engineering and technology to extrapolate CANWETTM from the watershed level up to the lake basin level and provide decision-making support for the entire Lake Erie basin.
Hussein Abdullah, Ph.D., P. Eng.
Director, School of Engineering
University of Guelph
January, 26 2015
Town of Collingwood
On behalf of the Town of Collingwood, I would like to thank the Greenland Group of Companies for their design and execution of the Town’s vision for Heritage Park, coordination of all consultants, contract administration and construction inspection.
Greenland always strives for thoroughness, professionalism and addressing their clients needs on each of their projects – this was no exception.
Peter G. Dunbar
Director, Leisure Services
Town of Collingwood
August 30, 2010