2024





Greenland International Consulting Ltd. is working with the Alberta Water Council (AWC) to provide a centralized location for the data and analytical tools needed to understand and assess risks to drinking water. Our team is delighted in having the opportunity to use our web-based THREATS platform to protect Albertans through this Source Water Protection project. Highlights from our October 1st presentation to the AWC can be viewed here



The Orbit will be a cutting-edge smart city anchored around the Metrolinx GO Station at the core of the development. The progressive design delivers a complete, cutting-edge community that is anticipated to grow to a population of 150,000 people.

In association with Greenland International Consulting Ltd., Urban Watershed Group Ltd. has been retained to provide complete site plan design engineering and construction administration services.



The Poplar Regional Health & Wellness Village will deliver Ontario’s premier “Base Camp” for Innovative Health & Wellness. Greenland International Consulting Ltd. has been retained as the Prime Engineer for this world-class development that will include a new regional hospital.
 
To learn more about The Poplar Regional Health & Wellness Village, please click here.



Last year, Urban Watershed Group Ltd. (UWG), was invited by lead architect Cherie Ng Architect Inc. to team on the FIFA World Cup ‘26’ Training Facility within Toronto, Canada.

Given the significant volume of earthworks involved and high priority to address drainage impact and sediment release concerns affecting nearby watercourses, UWG is providing grading, servicing and erosion-sediment control engineering and construction inspection services for all of the training sites.

 

Social Media

 
LinkedIn 
YouTube

Client Testimonials

Walton Development and Management

The Walton Group of Companies is a multinational real estate investment and development firm concentrating on the research, acquisition, administration, planning and development of strategically located land in major North American growth corridors. With nearly 90,000 acres of land under administration including 22 development projects, Walton is one of North America’s premier land asset managers.

Walton Development and Management L.P. (“Walton”) has retained Greenland International Consulting Ltd. (“Greenland”) to assist with our municipal infrastructure planning and engineering design for several new communities in the County of Simcoe, Ontario including environmental assessments and water resource analysis. Greenland is highly regarded in the industry for their professional approach to the environmental aspects of these projects and state-of-the-art decision support tools (such as CANWETTM) to address climate change adaptation, cumulative watershed impact, and adaptive management such as post-construction performance monitoring. Greenland’s business model is unique and has provided Walton with value-added deliverables through the use of best available science and solution-based methodology. This includes forming a landmark public/private sector phosphorous reduction program to protect a sensitive fishery habitat system within headwaters of the Nottawasaga River Basin for one of Walton’s projects in Simcoe County. Greenland’s CANWETTM model and other in-house stormwater management and climate change impact assessment tools were instrumental for Walton to establish long-term partnerships in this community, including the local municipality, Nottawasaga Valley Conservation Authority and other key stakeholders.

Paolo Sacilotto
General Manager, Simcoe
Walton Development and Management L.P

February 13, 2015
 

Town of Innisfil

Re: Erosion Control and Advanced Sedimentation Pilot Project
 
On behalf of the Town of Innisfil, I would like to extend my sincere thanks to Greenland International Consulting Ltd. for their excellent work in completing the Erosion Control and Advanced Sedimentation Pilot Project for the Town of Innisfil, funded in part by the Federation of Canadian Municipalities. This project is a first step in broad-scale implementation of innovative stormwater management technologies in the Lake Simcoe Watershed to address on-going phosphorus and sediment concerns within the Lake.

Over the course of the three-year pilot project, Greenland studied the effectiveness of the Clearflow Group’s Advanced Sedimentation Technologies at an active development site in Innisfil. The project analyzed the performance of Clearflow’s Gel Flocculant Blocks and Treated Geo-Jute at removing fine sediments and nutrients at three stormwater management facilities that discharge to Lake Simcoe. These particles, and the associated nutrients and heavy metals, are traditionally not being removed by conventional stormwater management facilities and cause negative impacts downstream. The results of the project will help Innisfil and other municipalities and agencies to reduce sediment load from entering the environment as a result of construction activities.
 
As the lead consultant, Greenland coordinated with the Town staff, contractors, sub-consultants and the developer to ensure that open lines of communication were maintained and questions and issues raised were responded to promptly. The Greenland Team’s level of professionalism and thoroughness over the course of the project was valued by the Town.
 
Glen Switzer
Development Engineer
Town of Innisfil

July 8, 2022
 

University of Guelph

The reappearance of excessive nutrient loading in Lake Erie and the subsequent algae blooms is an extremely complex issue and is quite different in nature than the previous phosphorous loadings in the 1970s. Unlike the issue in the 1970s, there are far more sources adding nutrients to the late and these sources are diverse in nature ranging from rural to urban. In order to understand the nutrient loading, both in the temporal and spatial domains, more complex analytic and predictive tools are required in order to help policy make sound, science based, and defendable solutions.

The University of Guelph is uniquely positioned to help address the issues around Lake Erie with long standing core strengths in both the agricultural sector and the environmental field. In conjunction with our partner, Greenland Consulting Engineers, and their watershed evaluation tool (CANWETTM), we believe that we have the engineering and technology to extrapolate CANWETTM from the watershed level up to the lake basin level and provide decision-making support for the entire Lake Erie basin.

Hussein Abdullah, Ph.D., P. Eng.
Director, School of Engineering
University of Guelph

January, 26 2015
 

Corporate Partnerships & Associations

Partnerships and Accreditations