First Nations Land Flood Protection Projects
Owen Sound Stormwater Facility Design & Construction
Smart_IoT_Stormwater Grid Partnerships
Great Lakes Protection & Restoration Initiatives
Innisfil 6th Line Urbanization & Road Upgrade
Belle Aire Community Landscape Architecture
Simcoe County Flood Forecasting & Warning System
Lake Erie Community Infrastructure Systems Design
Blue Mountains Watermain Design & Construction
Indigenous People Environmental Collaborations
Ontario Watershed Planning Guidance Manual
Emergency Management Services Facility
Cobourg Creek Assimilative Capacity Study
Waterloo Stormwater Management Facility Retrofit
Penetanguishene Main Street Construction.
Sudbury Waterfront & Trail Plan
Development Review Services (South Georgian Bay Region)
Cobourg LiDAR Floodline Mapping Study
Assessment of Options for Round Goby Removal
Lefroy-Belle Ewart Community Municipal Servicing Plan
Carp River Restoration Plan - Third Party Review
Water Budget and Stress Assessment Modeling
Town of Walkerton Floodline Mapping
Riverside Development and Minnesota Street Sanitary Sewer Improvements
Collingwood Industrial Area Sanitary Servicing Project
Graham and Wilmot Creeks Subwatershed Studies
The City of Waterloo
As a Senior Project Engineer (Water Resources) for the City of Waterloo, I would like to extend my appreciation to Greenland Consulting Engineers for providing exemplary EA planning, design, contract administration and construction inspection services for the Pond #53 Sediment Removal/Reuse and Retrofit Project.
This project was an important undertaking for the City which consisted of: the removal of 360m3 of sediment for reuse in a City owned boulevard area; removal of all additional sediment (approx. 3,000m3) from the SWMF permanent pool and forebay area to improve its operation, implementation of the retrofit design including improved maintenance access and proactive management of many unforeseen conditions throughout the duration of the project. This project also included significant logistical challenges with respect to the coordination of public access for area residents and businesses, and providing workable solutions to implementing the design as intended due to challenging unforseen site constraints.
As the Design Consultant, Contract Administrator and on-site Construction Inspector, Greenland always maintained open lines of communication between the City, Contractor and the affected residents, and promptly responded to all questions and issues raised by the Contractor, the City and the public. Greenland’s attention to detail throughout the entire duration of this assignment helped ensure the project was completed as required.
Jessica Kellerman, P. Eng
Senior Project Engineer - Water Resources
Engineering Services, Design & Construction
City of Waterloo
October 24, 2019
Town of Innisfil
Re: Erosion Control and Advanced Sedimentation Pilot Project
On behalf of the Town of Innisfil, I would like to extend my sincere thanks to Greenland International Consulting Ltd. for their excellent work in completing the Erosion Control and Advanced Sedimentation Pilot Project for the Town of Innisfil, funded in part by the Federation of Canadian Municipalities. This project is a first step in broad-scale implementation of innovative stormwater management technologies in the Lake Simcoe Watershed to address on-going phosphorus and sediment concerns within the Lake.
Over the course of the three-year pilot project, Greenland studied the effectiveness of the Clearflow Group’s Advanced Sedimentation Technologies at an active development site in Innisfil. The project analyzed the performance of Clearflow’s Gel Flocculant Blocks and Treated Geo-Jute at removing fine sediments and nutrients at three stormwater management facilities that discharge to Lake Simcoe. These particles, and the associated nutrients and heavy metals, are traditionally not being removed by conventional stormwater management facilities and cause negative impacts downstream. The results of the project will help Innisfil and other municipalities and agencies to reduce sediment load from entering the environment as a result of construction activities.
As the lead consultant, Greenland coordinated with the Town staff, contractors, sub-consultants and the developer to ensure that open lines of communication were maintained and questions and issues raised were responded to promptly. The Greenland Team’s level of professionalism and thoroughness over the course of the project was valued by the Town.
Glen Switzer
Development Engineer
Town of Innisfil
July 8, 2022
Intact Centre on Climate Adaptation
The Intact Centre on Climate Adaptation (ICCA) is a national applied research centre that focuses on mobilizing practical and cost-effective solutions to address climate change and extreme weather events. To this end, the ICCA is an incubator of new adaptation ideas, conducting research, knowledge mobilization and promoting initiatives aimed at de-risking the negative impacts of a changing climate and extreme weather. One of ICCA’s concerns is a growing uninsurable housing market in Canada relative to sewer backup.
ICCA believes the advanced technology and features of the SafeSump system can be instrumental to mitigating basement flood potential. I have one of the first prototypes of the SafeSump system installed in my home. I have interacted directly with the start-up founder. I view him as entrepreneurial and passionate, and have met other members of his team with whom I was similarly impressed. I am also familiar with Greenland Consulting Engineers, and congratulate SafeSump Inc. on their choice to create a joint “SafeSump” venture with Greenland.
ICCA looks forward to a supportive relationship with SafeSump Inc. upon the larger scale availability of their much-needed technology.
Dr. Blair Feltmate
Head, Intact Centre on Climate Adaptation
Faculty of Environment
University of Waterloo
October 6, 2016